Typical installation of welded frames (FW, CW) 1) Remove the shipping bars at the bottom of the frame. 2) Adjust the frame to be square, level, and plumb with jambs in the same vertical plane. 3) Brace the frame with 2" x 4" (50.8 mm x 101.6 mm) wood studs, as shown in Figure 1. 4) Install temporary spreaders as shown in Figure 2, at the center and at the bottom location of the frame. The spreader dimension should be the same as the door opening width. This will prevent the frame from bowing inside the opening when building the surrounding wall. 5) Verify the height and the width of the door opening once more before building the wall (tolerance of 1/32" (0.8 mm)). The frame should be square, level and plumb with jambs in the same vertical plane. 6) Anchor the frame to the floor, at the bottom of each jamb, with the floor base anchor. 7) Build the wall on each side.
8) Do not remove the temporary spreaders until the frame is permanently set into the wall. Reference: de La Fontaine: Technical data book page 5.2 |